Skip to main content
← All districtsResidentialZR 23-22

R9-1

R9-1 is a residential zoning district governed by ZR 23-22, with residential far of 9, a maximum building height of 175 feet.

FAR
9
Max height
175 ft
Parking / unit
0.4
Lots citywide
6

The bulk rules

These are the figures the engine applies when it models a lot in R9-1. Where a rule differs between a narrow and a wide street, both are shown.

Floor area

Residential FAR9ZR 23-22
Community facility FAR10ZR 23-22
Commercial overlay FAR2ZR 33-121
City of Yes (UAP) maximum FAR10.8ZR 27-16

Height and setback

Base minimum — wide street105 ftZR 23-22
Base maximum — wide street125 ftZR 23-22
Max height — wide street175 ftZR 23-22
Setback — wide street10 ftZR 23-22
Base maximum — narrow street125 ftZR 23-22
Max height — narrow street165 ftZR 23-22
Setback — narrow street15 ftZR 23-22
Max height with City of Yes affordability215 ftZR 23-432

Yards, coverage and shape

Front yard0 ftZR 23-45
Side yard0 ftZR 23-46
Rear yard20 ftZR 23-47
Lot coverage — interior lot80%
Lot coverage — corner lot100%
Street wall, minimum at base70%
Qualifying ground floor eligibleYes

Density, parking and affordability

Dwelling unit factor680 sf per unitZR 23-52
Minimum lot area, practical1,700 sf
Parking spaces per dwelling unit0.4ZR 25-23
MIH base FAR9ZR 27-131
MIH maximum FAR where mapped10.8ZR 27-131
Worked example — 10,000 sf lot

At 9 FAR, a 10,000 square foot lot in R9-1 carries roughly 90,000 square feet of zoning floor area, which at a 680 square foot dwelling unit factor is about 132 units.

That is the ceiling, not the answer. The height envelope, required yards, lot shape, street width, overlays and any special district all cut into it. Running the real lot is the only way to know which constraint binds first.

What those numbers look like

A section through the R9-1 envelope, drawn to scale from the figures in the table above. The solid shape is as of right; where the district carries a City of Yes uplift, the dashed outline is what affordable housing adds.

+40 FT WITH AFFORDABILITYSTREETREAR YARD 20 FTMAX 175 ftBASE 125 ftMIN 105 ftSETBACK 10 FT
R9-1 sectionwide streetDrawn to scale from the district rules.

Diagrammatic. It shows the governing heights and the setback on a regular lot, not your lot: the sky exposure plane, lot shape, corner conditions and any overlay all reshape this in practice.

Where R9-1 is mapped

Every area of the city zoned R9-1, from NYC Planning’s published zoning district layer.

Loading map…

What you may build

Use groups permitted in R9 districts:

  • UG 1Residences (1- and 2-family detached)
  • UG 2Residences (all types including apartments)
  • UG 3Community Facilities — schools, museums, libraries, child welfare
  • UG 4Community Facilities — houses of worship, hospitals, ambulatory care
  • UG 5Hotels, transient accommodations

R9-1 across the city

Tax lots mapped
6
Materially underbuilt lots
1

Underbuilt here means a lot of at least 2,500 square feet, built to less than half its residential floor area, in private hands, with at least 20,000 square feet of unused capacity. From PLUTO 26v2. How we counted.

Questions about R9-1

What is the FAR in R9-1?

R9-1 has a residential far of 9, set by ZR 23-22. On a 10,000 square foot lot that is about 90,000 square feet of zoning floor area before any bonus, and before the height envelope and yard requirements are applied.

How tall can a building be in R9-1?

The maximum building height in R9-1 is 175 feet on a wide street and 165 feet on a narrow street, with a street wall rising to between 105 and 125 feet before a required setback. Height is measured and applied under ZR 23-22.

Does City of Yes add floor area in R9-1?

Yes. Under the Universal Affordability Preference, R9-1 rises from 9 to 10.8 where the additional floor area is permanently affordable housing. That is an as-of-right increase, not a discretionary action.

What is the Mandatory Inclusionary Housing FAR in R9-1?

Where MIH is mapped on a lot in R9-1, floor area rises from 9 to 10.8, a gain of 1.8. MIH applies only where the City has mapped it, so it is a property-by-property question rather than a district-wide one.

This is the district. Now run your actual lot.

Run a report