Skip to main content
← All districtsManufacturingZR 43-12

M1-9A

M1-9A is a manufacturing zoning district governed by ZR 43-12, with commercial far of 15.

FAR
15
Lots citywide
37

The bulk rules

These are the figures the engine applies when it models a lot in M1-9A. Where a rule differs between a narrow and a wide street, both are shown.

Floor area

Residential FAR0ZR 43-12
Commercial FAR15ZR 43-12
Manufacturing FAR15ZR 43-12
Community facility FAR15ZR 43-12

Height and setback

Base maximum — wide street155 ftZR 43-12
Setback — wide street10 ftZR 43-12
Base maximum — narrow street155 ftZR 43-12
Setback — narrow street15 ftZR 43-12

Yards, coverage and shape

Front yard0 ftZR 23-45
Side yard0 ftZR 23-46
Rear yard10 ftZR 23-47
Lot coverage — corner lot100%

Density, parking and affordability

Worked example — 10,000 sf lot

At 15 FAR, a 10,000 square foot lot in M1-9A carries roughly 150,000 square feet of zoning floor area.

That is the ceiling, not the answer. The height envelope, required yards, lot shape, street width, overlays and any special district all cut into it. Running the real lot is the only way to know which constraint binds first.

Where M1-9A is mapped

Every area of the city zoned M1-9A, from NYC Planning’s published zoning district layer.

Loading map…

Straight from the Zoning Resolution

The sentences below are quoted verbatim from the Zoning Resolution text the engine is built against, for the M1-9A rules we have mirrored and checked by hand. Check us against them.

front setback ftZR 43-46
“a setback with a depth of at least 10 feet from any street wall fronting on a wide street and a depth of at least 15 feet from any street wall fronting on a narrow street”
Engine uses: 15 ft
front setback ftZR 43-46
“a setback with a depth of at least 10 feet from any street wall fronting on a wide street”
Engine uses: 10 ft
side yard min ftZR 43-25
“In all districts, as indicated, no side yards are required. However, if an open area extending along a side lot line is provided, it shall be at least eight feet wide.”
Engine uses: 0 ft

What you may build

Use groups permitted in M1 districts:

  • UG 3Community Facilities — schools, museums, libraries, child welfare
  • UG 4Community Facilities — houses of worship, hospitals, ambulatory care
  • UG 6Local retail, eating/drinking, office
  • UG 7Home furnishing, large retail (specialized)
  • UG 8Amusement (indoor)
  • UG 9Retail (larger), service establishments
  • UG 10Larger retail + home maintenance services
  • UG 11Custom manufacturing + specialized retail
  • UG 12General service, outdoor amusement, automotive
  • UG 13Automotive, boating, open amusements
  • UG 14Amusements + boating (large-scale)
  • UG 16Heavy commercial, certain manufacturing
  • UG 17General manufacturing

M1-9A across the city

Tax lots mapped
37
Materially underbuilt lots
0

Underbuilt here means a lot of at least 2,500 square feet, built to less than half its residential floor area, in private hands, with at least 20,000 square feet of unused capacity. From PLUTO 26v2. How we counted.

Questions about M1-9A

What is the FAR in M1-9A?

M1-9A has a commercial far of 15, set by ZR 43-12. On a 10,000 square foot lot that is about 150,000 square feet of zoning floor area before any bonus, and before the height envelope and yard requirements are applied.

How tall can a building be in M1-9A?

M1-9A is not governed by a flat height cap in the quality housing tables; height is controlled by the sky exposure plane and the bulk rules shown above.

This is the district. Now run your actual lot.

Run a report