Skip to main content

78-04 South Conduit Avenue zoning and development potential

78-04 South Conduit Avenue, Queens 11414 is a 140,971 square foot lot zoned R4. RunEnvelope’s engine finds an as-of-right scheme with homes of 281,942 sf (Residential + Community Facility), against 139,370 sf built on the lot today.

The lot

BBL
4-11358-0001
Block / lot
11358 / 1
Community district
Queens Community District 10
Zoning
R4
Lot area
140,971 sf
Frontage x depth
236 ft x 663 ft
Lot type
Block assemblage
Current use
Mixed residential and commercial
Built today
139,370 sf, 2 floors
Year built
2014
Built FAR
0.99

Permitted floor area against what is built

Built on the lot today139,370 sf
Largest scheme with homes: Residential + Community Facility281,942 sf

That leaves 142,572 sf more floor area than stands here now, if the existing building were replaced.

City Planning’s PLUTO file lists a residential FAR of 1.00 for this lot, which at 140,971 sf of land is 140,971 sf. The engine’s largest residential-only scheme without an affordability obligation (Max Apartments) holds 140,971 sf, close to that simple multiplication.

  • Narrow street frontage
  • E-designation on the lot
  • Coastal zone
  • Irregular lot shape

Development scenarios

The largest 6 as-of-right schemes RunEnvelope’s engine produced for this lot, by zoning floor area. A full study also models the building itself: floor plates, heights, setbacks, unit mix and parking.

SchemeTypeFloor areaFARHomes
Residential + Community FacilityMixed use with homes281,9422.00181
Community FacilityCommunity facility281,9422.00None
Commercial OverlayMixed use with homes252,1351.79144
Max CommercialCommercial218,7871.55None
Max ApartmentsHousing140,9711.00207
Max Residential (Parking Waiver: 14 units)Housing140,9711.0013

Floor area is zoning floor area in square feet. Highlighted: the largest scheme with homes. Income-restricted schemes (Universal Affordability Preference, AIRS senior housing) require a share or all of the homes to be affordable. Shared housing counts rooms, not apartments. Schemes that need a landmark transfer of development rights, the FRESH food store bonus or a stack of every program are left off this page; the full study shows them.

What these numbers are

As-of-right only: what the Zoning Resolution allows without a variance, special permit or rezoning. Computed by RunEnvelope’s zoning engine on October 24, 2026 from PLUTO 26v2 lot data, in screening mode: the engine uses the City’s recorded lot area and dimensions, not a surveyed lot outline.

This is not a professional opinion, an appraisal or a statement that anything will or should be built here. Existing tenants, leases and the owner’s plans are not part of it.

What a full study checks

  • ■The actual lot outline, street frontages and yards, not PLUTO's recorded dimensions
  • ■Easements, restrictive declarations and zoning lot agreements on record
  • ■Landmark, waterfront and flood rules that apply to the specific building
  • ■Height, setback and floor-by-floor massing, with floor plans
  • ■Unit count, parking and the affordability program terms

Why this lot has a page: we publish pages only for lots that clear a set of data quality and headroom tests.

This is the screening number. Get the study for 78-04 South Conduit Avenue.

Run the full study